Consistent establishment of safe worksites with a professional team

Our experience enables us to partner with our clients to develop and implement cost-effective traffic management solutions.

Drysdale Bypass

Client
Decmil

Project value
$11m

Date works performed
August 2018 to July 2020

Location
Drysdale, Victoria

Description ALL Set was the traffic management partner for the new $117 million bypass, stretching 6 kilometres from Jetty Road to the north of Whitcombes Road. The new bypass aims to significantly reduce traffic congestion through the centre of Drysdale and ensure safer, more efficient journeys on the Bellarine Peninsula.

Keep Ballarat Moving

Client

Seymour Whyte

Project value

$26m

Date works performed

2022 to 2024 (in progress)

Location

Ballarat, Victoria

Description

ALL Set is supporting the delivery of works that will upgrade the Hertford and Albert Street Intersections.

Barwon Heads Road Upgrade - between Barwarre Road and Marshalltown Road

Client

BMD

Project value

$295m

Date works performed

August 2021 to July 2023

Location

Geelong, Victoria

Description ALL Set is supporting the duplication of 1.km of Barwon Heads Road between Barwarre Road and Marshalltown Road from two lanes to four lanes. This also includes building a new bridge over the railway line at Marshall, removing the level crossing and building a new walking and cycling path along Barwon Heads Road to make the journey safer and improve access to the local area.

Barwon Heads Road Upgrade - Barwarre Road to Settlement Road

Client

Decmil

Project value

$295m

Date works performed

August 2021 to July 2023

Location

Geelong, Victoria

Description

ALL Set is supporting the delivery of works that includes: Construction of a new two-lane carriageway. Reconstruction, realignment, rehabilitation and upgrade of the existing carriageway. Upgrade of two signalised intersections and construction of two new signalised intersections. Additionally, we are supporting Decmil to construct a new four-lane bridge over Waurn Ponds Creek, and a cantilever structure for provision of shared use path adjacent to wetlands. 

Warrnambool Line Upgrade

Client

Downer

Project value

Total: $510m, Downer section: $114m

Date works performed

Mid 2020 to end 2022

Location

Geelong to Warrnambool

Description

Go Traffic is supporting the $114 million Warrnambool Line upgrade which includes: Construction of a new crossing loop, Signaling upgrades between Waurn Ponds and Warrnambool and Level crossing upgrades.

Princess Highway West - Winchelsea to Colac

Client

Decmil – Warncoort to Colac East

Project value

$363m

Date works performed

2016 to 2020

Location

Colac East

Description

Go Traffic supported works that added 8.5kms of new lanes, upgraded six intersections and included the installation of Flexible Safety Barriers.

Princess Highway West - Winchelsea to Colac

Client

BMD – Armitage to Warncoort

Project value

$363m

Date works performed

2016 to 2019

Location

South West Victoria

Description
Go Traffic supported works that added extra lanes and built new intersections along the Princes Highway between Winchelsea and Colac to make everyone’s journey quicker and safer. The works stretched out over 35km and included management of daytime traffic volumes in excess of 13,000 cars per day.
Scroll to Top